SolicitFit
SolicitationsNASA
NASA

National Aeronautics and Space Administration SBIR/STTR

NASA SBIR/STTR proposals are screened for administrative compliance before review — a page over the limit or type below the minimum can get one returned unread. Below: the rules SolicitFit checks, each cited to its source, and the NASA opportunities open now.

At a glance: 10 pt min · 1.0″ margins · 15 pg 22 cited rules 0 open now NASA deadlines

NASA SBIR/STTR page limits, fonts and administrative rules

From SolicitFit's rule library: each rule links to its source and names the solicitation cycle it was verified against. Rules change between cycles and the current solicitation always wins — or upload it to get its exact requirements, free.

Page limits

  • A Phase I technical proposal — all 9 parts including all graphics — must not exceed a total of 15 standard letter-size (8.5 x 11 inch / 21.6 x 27.9 cm) pages. NASA will not accept technical proposal uploads with any page(s) over the 15-page limit. The additional forms required for proposal package submission do not count against the 15-page limit, but all submitted content other than those required forms counts against the page limit. Verified verbatim in NASA's FY2025 SBIR Phase I solicitation Section 3.1.2. For FY2026-2027 the BAA Reference Guide confirms a single total page-limit applies and lists the same proposal parts, but the binding total number is stated in the per-appendix BAA documents (not in the Reference Guide), so confirm the exact number against the active 2026/2027 appendix.

    Confirm in the current solicitationSource: NASA Fiscal Year 2025 SBIR Phase I Solicitation, Section 3.1.2 'Required Page Limits and Suggested Page Lengths': 'A Phase I technical…· Verified against FY2025 SBIR Phase I (15-page total verified; FY2026-2027 BAA total is appendix-specific and not restated in the Reference Guide)
  • Suggested (not strict) per-part page lengths for SBIR Phase I within the total page limit: Identification & Significance of the Innovation 3.5; Technical Objectives 1; Work Plan 3; Related R/R&D 1; Key Personnel & Bibliography 2.5; Commercialization and Business Plan (FY2025: 'The Market Opportunity') 1; Facilities/Equipment 1; Subcontractors & Consultants 1; Related/Essentially Equivalent/Duplicate Proposals & Awards 1. The FY26-27 BAA Reference Guide states these are guidelines and not strict requirements (except a minimum-page requirement for the Commercialization and Business Plan in SBIR/STTR Phase II), and that you are still required to meet the total page-limit proposal requirements as described in the BAA.

Font

Margins

Line spacing

Required sections

  • NASA administratively screens all elements of a proposal package for compliance with format requirements. At its discretion, NASA may decline any proposal package or disregard specific proposal content that exceeds the stated limits when adjusted to comply with format requirements. Separately, the Administrative Review reviews all proposal packages received by the published deadline against Chapters 3 and 6; NASA may decline and not evaluate a proposal package that is not compliant with the requirements in chapters 3 and 6 (eliminated from consideration without technical evaluation).

  • Include the SBC (small business concern) name, proposal number, and project title in the header on each page of the proposal. Include the page number and the proprietary legend (if applicable) in the footer on each page. Margins may be used for header/footer information.

  • The Phase I technical proposal must contain all 9 parts in order, number, and title: Part 1 Identification and Significance of the Proposed Innovation; Part 2 Technical Objectives; Part 3 Work Plan; Part 4 Related R/R&D; Part 5 Key Personnel and Bibliography of Directly Related Work; Part 6 The Market Opportunity (the FY2026-2027 BAA Reference Guide labels the equivalent part 'Commercialization and Business Plan'); Part 7 Facilities/Equipment; Part 8 Subcontractors and Consultants; Part 9 Related, Essentially Equivalent, and Duplicate Proposals and Awards. NASA will decline any proposal package that does not have all 9 parts and it will not be evaluated; if a part is not applicable, it must still be included and marked 'Not applicable.'

    Source: NASA Fiscal Year 2025 SBIR Phase I Solicitation, Section 3.1.3.5: 'The technical proposal must contain all 9 parts in order, number, and title as…· Verified against FY2025 SBIR Phase I; part structure confirmed for FY2026-2027 BAA Reference Guide

Eligibility

Foreign ownership

Registrations

  • Offerors must register with the SBIR Firm Registry (https://www.sbir.gov/registration) and with SBA's Company Registry, updating commercialization status, and must provide a unique SBC Control ID (assigned by SBA upon completion of Company Registry registration) and upload a PDF copy of the SBA Company Registry registration. This is in addition to SAM.gov registration. Active SAM registration under NAICS code 541713 or 541715 as a small business is also required at time of submission.

  • Offerors must be registered in SAM.gov with a validated Unique Entity Identifier (UEI) and a CAGE code at the time the offer is submitted (FAR 4.1102(a)). The SAM registration must be active under NAICS code 541713 or 541715 as a small business at the time of proposal submission, with purpose of registration listed as 'All Awards.' NASA advises applying immediately as registration typically takes several weeks.

  • All Phase I proposal packages must be submitted electronically through NASA's ProSAMS (Proposal Submissions and Award Management System) at https://prosams.nasa.gov. ProSAMS requires firm registration and login. The package must be electronically endorsed by the designated small business representative and the principal investigator before the deadline. The proposal package comprises the required forms enumerated in Section 3.1.3 (contact info, certifications, summary, budget, technical proposal, briefing chart, optional TABA, I-Corps form, SBC-level forms, and electronic endorsement).

    Source: NASA Fiscal Year 2025 SBIR Phase I Solicitation, Section 2 intro: 'You must use the Proposal Submissions and Award Management System (ProSAMS) to…· Verified against FY2025 SBIR Phase I (ProSAMS confirmed for FY2026-2027 BAA Reference Guide acronym list)

Cost volume

Deadline

Open NASA SBIR/STTR opportunities

None of NASA's current topics are in our catalog (it's built from SBIR.gov and Grants.gov). Check NASA SBIR/STTR for open topics, then upload the solicitation for its requirements.

Check your NASA draft against these rules

Upload the solicitation for its cited requirements matrix in under a minute — then scan your draft PDF. See a sample report.

Run a free check
SolicitFit audits your human-written draft for administrative compliance. It does not write proposal content and is not legal advice or a guarantee of acceptance. Don't upload classified / ITAR / CUI material.