Department of Energy SBIR/STTR
DOE SBIR/STTR proposals are screened for administrative compliance before review — a page over the limit or type below the minimum can get one returned unread. Below: the rules SolicitFit checks, each cited to its source, and the DOE opportunities open now.
DOE SBIR/STTR page limits, fonts and administrative rules
From SolicitFit's rule library: each rule links to its source and names the solicitation cycle it was verified against. Rules change between cycles and the current solicitation always wins — or upload it to get its exact requirements, free.
Page limits
The biographical information (biosketch) for each senior/key person must not exceed 3 pages.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023): 'The biographical information for each person must not exceed 3 pages and must include:...'· Verified against FY2023 guide; confirm against current FOAIn addition to the 15-page limit, the Project Narrative must not exceed 7,500 words of text. Both the 15-page and 7,500-word limits apply (the guide states '15 pages, 7,500 words of text, including the cover page').
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Field 8: 'The project narrative describing your technology must not exceed 15 pages,…· Verified against FY2023 guide; confirm against current FOAThe Project Summary/Abstract must not exceed 1 page and is attached separately (Field 7) from the Project Narrative.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), item 7 'Project Summary/Abstract': 'The Project Summary/Abstract must not exceed 1…· Verified against FY2023 guide; confirm against current FOAThe Project Narrative must not exceed 15 pages, including the cover page. Bibliography/References Cited, Facilities & Other Resources, and Equipment information all count against the 15-page limit. The budget justification, level-of-effort worksheet, and project summary are attached separately and do not count.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Field 8 'Project Narrative': 'The project narrative describing your technology must not…· Verified against FY2023 guide; 15-page limit corroborated by current PAMS application guide (FY2026 cycle); confirm against current FOA
Font
DOE does not mandate a specific font typeface for the Project Narrative. The only typographic constraint located is the 11-point minimum font size. No required font family (e.g., Times New Roman/Arial) appears in the DOE Aug 2023 PDF guide or the PAMS application guide.
Confirm in the current solicitationSource: Verified absence of any font-type requirement: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Field 8 (no typeface specified); PAMS…· Verified against Current PAMS guide (FY2026 cycle); confirm against current FOAThe Project Narrative must use a minimum of 11-point font size. (This font-size rule is stated in the PAMS application guide, not in the Aug 2023 PDF guide, which gives only the 15-page/7,500-word limits.)
Source: DOE PAMS External Help application guide, Project Narrative page: 'the project narrative must not exceed 15 pages with 11-point minimum font size'…· Verified against Current PAMS guide (FY2026 cycle)
Required sections
A Disclosure of Foreign Relationships form is a mandatory document, submitted as a PDF in Field 12, in accordance with the SBIR and STTR Extension Act of 2022. The current DOE applicant-resources page confirms it remains required.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Field 12: 'Disclosure of Foreign Relationships Form (Required...)' and Mandatory…· Verified against FY2023 guide; still listed on current DOE applicant-resources pageA Letter of Intent (LOI) is mandatory and must be submitted (via PAMS) by the LOI deadline. If you fail to submit an LOI by the deadline, you are ineligible to submit a full application. The full application must match the LOI; applications not meeting this requirement may be administratively declined.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023): 'prior to submitting an application, you are required to submit a letter of intent. If…· Verified against FY2023 guide; FY2026 LOI deadlines confirmed on the DOE FY-2026 funding pageEach page of the Project Narrative must include a header with the company name, project title, and topic number/subtopic letter; and each page must be sequentially numbered in the page footer.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Field 8: 'The Project Narrative header should also include company name, project title,…· Verified against FY2023 guide; confirm against current FOAOnly one Principal Investigator (PI) is accepted per project; co-PIs are not allowed. Applications listing co-PIs will be delayed while the applicant corrects the error. (The guide also notes the 'Co-PI' role is not currently used by DOE.)
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023): 'In order to ensure appropriate technical guidance for the project, only one PI will be…· Verified against FY2023 guide; confirm against current FOAA brief Commercialization Plan (4 pages maximum) MUST be included in a Phase I grant application. If the Commercialization Plan is not included at the time of application submission, the application will be administratively declined without review. It is evaluated under the 'Impact' criterion and is submitted via Question 7 of the SBIR/STTR Information Form (attached to Field 8).
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), item 7 'Commercialization Plan': 'A brief commercialization plan (4 pages maximum) MUST…· Verified against FY2023 guide; confirm against current FOAPer the Field 8 outline, the Project Narrative must include ALL of: Cover page; Proprietary Data Legend (if applicable); Identification and Significance of the Problem/Opportunity and Technical Approach; Anticipated Public Benefits; Technical Objectives; Work Plan; Performance Schedule; Facilities/Equipment; Research Institution info (required for STTR, optional for SBIR); Other Consultants and Subcontractors; and Bibliography & References Cited. The outline also lists Phase II and Phase III Funding Commitments as OPTIONAL items, and (per the Aug 2023 guide) a PIER Plan appendix (see separate rule on current status).
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Field 8: 'Using the outline below, the Project Narrative must include ALL of the…· Verified against FY2023 guide; confirm against current FOA
Eligibility
Each application must respond to a specific Topic and, within it, to only one subtopic announced in the current FOA. The topic number/subtopic letter must be identified in a header on each page of the Project Narrative and on the SF424 R&R in field 11 (preceding the project title). Topic numbers change each FOA release; the application is evaluated under the topic identified, and DOE will not reassign applications to the correct topic number if identified incorrectly.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Field 8: 'A grant application must respond to a specific Topic and, within it, to only…· Verified against FY2023 guide; topic lists are per-FOAFor SBIR, the PI's primary employment must be with the small business applicant at the time of award and during the conduct of the proposed research. Primary employment means no less than 20 hours per week (more than one-half of a 40-hour workweek) in the employment of the small business, and no more than 19 hours per week in the employment of another organization.
SBIR onlySource: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023): 'the PI's primary employment must be with the small business applicant at the time of…· Verified against FY2023 guide; baseline from SBA Policy DirectiveFor STTR Phase I and Phase II, not less than 40 percent of the R/R&D work must be performed by the SBC, and not less than 30 percent by a single partnering Research Institution. Deviations from this STTR split are not allowed (specified in statute at 15 USC 638(e)).
STTR onlySource: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Sec 4.7: 'In both STTR Phase I and Phase II, at least 40% of the work must be performed…· Verified against Policy Directive (statutory baseline); also stated verbatim in DOE Aug 2023 guideThe awardee small business concern must have no more than 500 employees, including the employees of its affiliates, and SBA must not have issued a size determination currently in effect finding the concern exceeds the 500-employee size standard.
Source: SBA SBIR/STTR Policy Directive, Appendix certification: '(6) The Awardee business concern has no more than 500 employees, including the employees…· Verified against Policy Directive (statutory/regulatory baseline, 13 CFR 121.702)For Phase I, the research/R&D project activity must be performed in the United States. Based on a rare and unique circumstance (e.g., a supply, material, or study design not available in the U.S.), DOE may allow a particular portion of the work to be performed or obtained in a foreign country, but it must be thoroughly justified in the application.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023): 'For Phase I, the research or R&D project activity must be performed in the United…· Verified against FY2023 guide; baseline from SBA Policy DirectiveFor SBIR Phase I, a minimum of two-thirds (67%) of the research or analytical effort must be performed by the awardee small business concern; consultant/contractual third-party arrangements generally may not exceed 33% of the total requested. Deviations require written approval from the Funding Agreement officer. (For SBIR Phase II the minimum is one-half / 50%.)
SBIR onlySource: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Sec 4.7: 'In an SBIR Phase I, a minimum of two-thirds or 67% of the research or…· Verified against Policy Directive (statutory baseline); also stated verbatim in DOE Aug 2023 guide
Foreign ownership
The SBC must be directly owned and controlled by individuals (who are U.S. citizens or permanent resident aliens) or by SBCs that are themselves so owned/controlled (an SBC directly owned and controlled by an Indian Tribe, or by another SBC so owned/controlled, is also eligible), per 13 CFR 121.702. Alternatively, an SBC may be more than 50% owned by multiple domestic VC operating companies, hedge funds, and/or private equity firms (subject to agency program rules and SBA registration); it may NOT be more than 50% owned by a single such firm.
Source: SBA SBIR/STTR Policy Directive: size regulations require an Awardee 'be directly owned and controlled by individuals or SBCs' (Indian Tribe-owned…· Verified against Policy Directive (statutory/regulatory baseline, 13 CFR 121.702)
Registrations
Before submitting, applicants must register with: SAM.gov (System for Award Management, which generates the UEI - Unique Entity Identifier); Grants.gov (a one-time organizational registration that includes designating an Authorized Organization Representative); and PAMS (required to submit a pre-application or the Letter of Intent). DOE warns that applicants not registered with SAM and/or Grants.gov should allow up to 8 weeks. (SBA Company Registry registration is also part of the SBIR/STTR baseline and is listed as a mandatory document in Field 12.)
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Required Registrations: 'register with the System for Award Management (SAM), and…· Verified against FY2023 guide; current process unchanged
Cost volume
Phase I awards are up to $200,000 (for six months to one year). The exact ceiling depends on the topic and the current FOA.
Confirm in the current solicitationSource: DOE Notice of Funding Opportunity SBIR/STTR FY 2025 Phase I Release 2 (DE-FOA-0003504) page: 'SBIR/STTR Phase I awards are up to $200,000 for six…· Verified against FY2025 Release 2 NOFO; FY2026 ceiling to confirm in current FOAThe Phase I budget period may be less than, but no longer than 12 months (typically 6 to 12 months). The Phase II application is due approximately 9.5 months after the project start date, and critical milestones should be completed in the first 9 months.
Source: DOE SBIR/STTR Phase I Grant Application Guide (Aug 2023), Performance Schedule: 'The Phase I budget period may be less than, but no longer than 12…· Verified against FY2023 guide; FY2025 NOFO; confirm against current FOA
Deadline
FY2026 Phase I deadlines per the DOE Office of Science FY-2026 funding page (all marked 'Delayed'): Release 1 - FOA issued Mon Aug 4, 2025; LOI due Tue Aug 26, 2025 5:00pm ET; full applications due Tue Oct 7, 2025 11:59pm ET. Release 2 - FOA issued Mon Dec 15, 2025; LOI due Tue Jan 6, 2026 5:00pm ET; full applications due Wed Feb 25, 2026 1:59pm ET. (Third-party sources citing a July 7, 2026 Release 2 deadline are NOT supported by the live DOE page; do not rely on that date.)
Confirm in the current solicitationSource: DOE Office of Science SBIR FY 2026 funding page: 'Release 1... LOI Due: Tuesday, August 26, 2025 5:00pm ET (Delayed); Full Applications Due:…· Verified against FY2026 Phase I Release 1 and Release 2 (deadlines marked Delayed; confirm against live page/FOA before relying)
4 more DOE rules are being re-verified and aren't shown.
Open DOE SBIR/STTR opportunities
None of DOE's current topics are in our catalog (it's built from SBIR.gov and Grants.gov). Check DOE Office of Science SBIR/STTR for open topics, then upload the solicitation for its requirements.
Check your DOE draft against these rules
Upload the solicitation for its cited requirements matrix in under a minute — then scan your draft PDF. See a sample report.